Commercial Indoor Range Upgrade
AR500 steel trap wall extensions and ballistic system upgrades
Indoor Range System Upgrade – Savannah, GA
Overview
This project involved targeted ballistic system upgrades at an indoor commercial shooting range in Savannah, Georgia. East Coast Installation Group performed professional installation services to extend and reinforce existing bullet trap wall assemblies through the addition of AR500 steel and impact protection components.
The upgrades were designed to improve projectile containment, enhance durability in high-impact zones, and extend the service life of the existing range infrastructure.
Planning
Project planning focused on integrating new ballistic components with the existing granular trap system while maintaining proper alignment, load distribution, and compatibility with existing structures.
Key planning considerations included:
Coordination of new AR500 assemblies with existing trap shields
Verification of mounting locations and fastening requirements
Sequencing installation to maintain ballistic integrity throughout the process
Review of component weights and load impacts on existing structures
Regulatory & Safety Considerations
All work was performed in accordance with manufacturer specifications and recognized best practices for indoor shooting range ballistic systems.
Safety considerations included:
Installation of AR500 steel components in designated impact zones
Secure anchoring of all wall-mounted and shield-mounted assemblies
Adherence to approved materials and fastening methods
Consideration of total system weight and structural support requirements
Construction / Installation Process
The project was executed in controlled phases to ensure accuracy, safety, and system performance.
Trap Wall Extensions: Installed new trap wall extension assemblies across multiple bays, mounted from left to right on top of existing granular trap shields.
Ballistic Steel Installation: Installed AR500 steel wall-mounted plates with pre-drilled mounting holes to enhance impact protection.
Impact Panel Integration: Installed dura-panel impact surfaces using approved adhesives and anchoring systems.
System Coordination: Integrated new components with existing trap infrastructure while maintaining proper clearances and alignment.
Maintenance and Upkeep
The installed upgrades were designed to support long-term operational reliability with defined maintenance requirements.
Maintenance considerations included:
Routine inspection of AR500 steel plates and mounting hardware
Monitoring of impact panels and adhesive bonds
Periodic evaluation of trap wall extensions and surrounding components
Conclusion
The successful completion of this indoor range system upgrade in Savannah, Georgia, demonstrates East Coast Installation Group’s ability to perform precise ballistic enhancements within existing range environments. Through careful planning and professional installation, the facility was upgraded with reinforced impact protection designed to support continued safe operation and extended service life.
Project Gallery